
We have exported our goods to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the United states, Canada, and so on. Hangzhou EPG Co.,Ltd. , was launched in November, 1997. With its five wholly owned subsidiaries. It has set up steady cooperation with many properly recognized universities and institutes in china this sort of as, Zhejiang University, Jilin University, Specialized committee of national chain push regular, Institute of national chain travel, Zhejiang software engineering materials institute, Huhan content defense institute and it cooperated to discovered China 1st Vehicle chain institute with National chain push institute. 2t EPT for Sale Supplied by Hstowercrane
EPTT EPT
ProEPTnt Characteristics of EPTT Lift
one period Mast EPT welded by welding Robotic guarantees reliable quality and classy appearance period
2 interval All the steel buildings are processed with blasting EPT to take away rust period The adhesion of floor portray is outstXiHu (West EPT) Dis.Hu (West EPT) Dis. period
3 period Suspension cage guarding board adopts figured EPT plate and numerical management punched EPT plate period of time The suspension cage is lightweight and creative in look time period
four period of time Driving system provided by the specialist maker with high performance comma EPTT service lifestyle and stability in overall performance period
5 period Total set of overload safety products comma assortment of limiters and mechanical EPT gadgets ensure its trustworthiness period Anti-falling basic safety unit adopts SAJ40-1 period2 comma which restricts the abnormal downward movement of the cage comma stopping and removing incidents period of time
six periodEPTT elevator with frequency inverter is risk-free comma stable and relaxed period Commencing electrical power is scaled-down than operating electric power comma vitality-conserving and large efficient period
The Mast EPT lparcolor is variable or galvanized rpar is created of seamless pipe period of time
lparThe high high quality seamless steel pipe is very good verticality comma anti-pressure comma anti-growing older comma thickness and so on rpar
Concluded safety actions
one time period Equipped with Anti-falling governor period of time
2 interval EPT an EPT interlock colon Doorway basic safety switches comma Slack rope change interval
3 interval Safety hook time period
four time period Higher and base limit switches comma entice door limit change period
five period Overload protector interval
six period of time Bottom Buffer interval
7 period Frequency Conversion lparInverter rpar for select period of time
8 period PLC EPTT method for pick pick interval
9 period of time Stage Contacting method and Automobile leveling system for choose select period
| hoist with common motor | |||||||
| variety | product | hoist speed lparm solmin rpar | rated load potential lpart rpar | counterweight lparkg rpar | motor EPTT lparkw rpar | notes | |
| solitary cage-with counterweight | SCD100 | 33 | one | 550 | 2 ast11 | one time period rparcage size can be lparl astw asth rpar 2 period5 ast1 period3 ast2 period5m or 3 sol2 ast1 period3 ast2 period5m or as client necessary time period two time period rparcage door can be wire mesh comma aluminium plate 3 interval rparEPTr cab can be pick or with out for preserving EPTT rooms period | |
| SCD120 | 33 | one period2 | 600 | 2 ast11 | |||
| SCD200 | 34 | two | 1000 | two ast11 | |||
| solitary cage-without counterweight | SCD100 | 34 | one | sol | two ast11 | ||
| SCD120 | 33 | 1 period2 | sol | two ast11 | |||
| SCD200 | 34 | 2 | sol | three ast11 | |||
| double cage-with counterweight | SCD100 | 34 | two ast one | 2 ast 550 | 2 ast2 ast11 | ||
| SCD120 | 33 | two ast one period2 | 2 ast 600 | 2 ast two ast11 | |||
| SCD200 | 34 | 2 ast 2 | two ast 1000 | two ast two ast11 | |||
| double cage-with no counterweight | SCD100 | 34 | two ast 1 | sol | 2 ast two ast11 | ||
| SCD120 | 33 | 2 ast one period2 | sol | two ast 2 ast11 | |||
| SCD200 | 34 | 2 ast two | sol | 2 ast 3 ast11 | |||
| hoist with VFD | |||||||
| sort | design | hoist pace lparm solmin rpar | rated load capability lpart rpar | motor EPTT lparkw rpar | Inverntor EPTT lparkw rpar | counterweight lparkg rpar | notes |
| single cage-with counterweight | SCDB200 | ~63 | 2 | 2 ast2 ast11 | 37 | two ast1000 | 1 interval rparcage dimension can be lparl astw asth rpar 2 period5 ast1 period3 ast2 period5m or 3 sol2 ast1 period3 ast2 period5m or as customer needed time period 2 interval rparcage doorway can be wire mesh comma aluminium plate three interval rparEPTr cab can be select or without having for saving EPTT rooms period |
| one cage-without counterweight | SCB100 | ~sixty three | 1 | two ast3 ast11 | 37 | sol | |
| SCB200 | ~sixty three | 2 | two ast3 ast11 | 37 | sol | ||
| double cage-with counterweight | SCDB100 sol100 | ~63 | one | 2 ast2 ast11 | 37 | sol | |
| SCDB200 sol200 | ~63 | 1 | 2 ast2 ast11 | 37 | sol | ||
| double cage-with no counterweight | SCB100 sol100 | ~sixty three | one | 2 ast2 ast11 | 37 | sol | |
| SCB200 sol200 | ~sixty three | 1 | 2 ast3 ast11 | 37 | sol | ||
Our services
—-Supplying well timed shipping comma standby engineers are all set to slove any of your difficulty in time interval
—-we give a single a long time guarantee for the steel structure period of time
—-Delivering all-embraced guarantee of products top quality comma worksite installation direction
—-Supplying sufficient spare elements and training of operation and routine maintenance
—-Engineers have more than five many years apos expertise time period

